Existing connection
Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.
Discuss your project Application
Where a suitable steel stirrup or reinforcing-bar arrangement is already available, NON-DRILL has a connection that can use it as part of an Edge Protection system without drilling into the concrete. This gives the project another option when a conventional lifting-anchor connection is not present. The bar size, position, condition and the loads on the complete handrail arrangement need to be checked before that option is selected.
Discuss your projectThe starting point
NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.
Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.
If the project is early enough, consider the position and purpose of the connection before manufacture or construction.
What to establish
01What steel stirrup is available?
02Where is it positioned?
03What Edge Protection arrangement is required?
Common questions
Where a suitable steel stirrup or reinforcing-bar arrangement is already available, NON-DRILL has a connection that can use it as part of an Edge Protection system without drilling into the concrete. This gives the project another option when a conventional lifting-anchor connection is not present. The bar size, position, condition and the loads on the complete handrail arrangement need to be checked before that option is selected. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.
Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.
Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.
Discuss your project
Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.
Discuss your project