Application

Sheet pile

Sheet-pile works can leave long exposed edges while excavation or retaining work progresses. NON-DRILL’s sheet-pile connection offers a way to position Edge Protection along a suitable pile line without drilling new fixing holes. The pile profile, thickness, condition and location of the work area inform the connection and handrail layout, allowing protection to be planned around the actual edge rather than added as an awkward afterthought.

Discuss your project

The starting point

Use the connection already available, or consider it early.

NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.

01

Existing connection

Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.

02

Design-stage connection

If the project is early enough, consider the position and purpose of the connection before manufacture or construction.

What to establish

Questions for the first project conversation.

01What sheet-pile profile is being used?

02What access is available?

03What drawings or photographs can be supplied?

Common questions

What project teams need to know first.

Can NON-DRILL be considered for Sheet pile?

Sheet-pile works can leave long exposed edges while excavation or retaining work progresses. NON-DRILL’s sheet-pile connection offers a way to position Edge Protection along a suitable pile line without drilling new fixing holes. The pile profile, thickness, condition and location of the work area inform the connection and handrail layout, allowing protection to be planned around the actual edge rather than added as an awkward afterthought. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.

Does the anchor need to be planned into the design?

Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.

What should I send for an initial review?

Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.

Discuss your project

Discuss a Sheet pile application.

Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.

Discuss your project