Featured application

RE walls

Reinforced earth walls need Edge Protection as panels are placed, backfilling progresses and other crews move in. NON-DRILL can connect to suitable lifting anchors already cast into the wall elements, giving the team a handrail without drilling into the finished concrete. Where a permanent handrail is part of the design, the same posts and rails can also form part of a planned temporary-to-permanent transition, so the protection stays coordinated with the construction sequence.

Discuss your project

The starting point

Use the connection already available, or consider it early.

NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.

01

Existing connection

Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.

02

Design-stage connection

If the project is early enough, consider the position and purpose of the connection before manufacture or construction.

Application journey

From project information to an agreed pathway.

Each application follows the same route: identify what the structure already offers, match it to a connection, and agree the installation arrangement.

01

Review the structure

Confirm the element, project stage and when Edge Protection is required.

02

Identify the connection

Review existing anchor information or the opportunity to plan a connection into the build.

03

Confirm the arrangement

Provide the relevant product, installation and technical information for project review.

What to establish

Questions for the first project conversation.

01Are lifting anchors already available?

02When is Edge Protection required in the installation sequence?

03Is a temporary-to-permanent pathway being considered?

04What drawings and panel information are available?

Common questions

What project teams need to know first.

Can NON-DRILL be considered for RE walls?

Reinforced earth walls need Edge Protection as panels are placed, backfilling progresses and other crews move in. NON-DRILL can connect to suitable lifting anchors already cast into the wall elements, giving the team a handrail without drilling into the finished concrete. Where a permanent handrail is part of the design, the same posts and rails can also form part of a planned temporary-to-permanent transition, so the protection stays coordinated with the construction sequence. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.

Does the anchor need to be planned into the design?

Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.

What should I send for an initial review?

Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.

Discuss your project

Discuss a RE walls application.

Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.

Discuss your project