Existing connection
Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.
Discuss your project Application
Bridge parapets bring the need for Edge Protection close to finished concrete and active construction work. NON-DRILL can connect to suitable cast-in points on the parapet or to anchors planned into the segment design, instead of relying on new drilled fixings after placement. Top- or side-mounted arrangements can be considered according to the available space and work sequence. The connection, post layout and handrail are then detailed for the particular parapet and project.
Discuss your projectThe starting point
NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.
Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.
If the project is early enough, consider the position and purpose of the connection before manufacture or construction.
What to establish
01Which cast-in points are available?
02Is the connection top- or side-mounted?
03What is the required post position?
Common questions
Bridge parapets bring the need for Edge Protection close to finished concrete and active construction work. NON-DRILL can connect to suitable cast-in points on the parapet or to anchors planned into the segment design, instead of relying on new drilled fixings after placement. Top- or side-mounted arrangements can be considered according to the available space and work sequence. The connection, post layout and handrail are then detailed for the particular parapet and project. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.
Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.
Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.
Discuss your project
Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.
Discuss your project