Jersey barriers can provide more than a boundary: their suitable lifting anchors can also provide connection points for hoarding posts. NON-DRILL used this approach for a CPB Contractors project, supporting timber hoarding from existing barriers while reducing the need for extra drilling, framing and propping. Because hoarding catches wind, the barrier, post, screen height and site conditions are assessed together. The result is a practical temporary-works arrangement built around the barrier already on site.

Discuss your project

The starting point

Use the connection already available, or consider it early.

NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.

01

Existing connection

Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.

02

Design-stage connection

If the project is early enough, consider the position and purpose of the connection before manufacture or construction.

What to establish

Questions for the first project conversation.

Common questions

What project teams need to know first.

Can NON-DRILL be considered for Hoarding?

Jersey barriers can provide more than a boundary: their suitable lifting anchors can also provide connection points for hoarding posts. NON-DRILL used this approach for a CPB Contractors project, supporting timber hoarding from existing barriers while reducing the need for extra drilling, framing and propping. Because hoarding catches wind, the barrier, post, screen height and site conditions are assessed together. The result is a practical temporary-works arrangement built around the barrier already on site. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.

Does the anchor need to be planned into the design?

Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.

What should I send for an initial review?

Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.

Discuss your project

Discuss a Hoarding application.

Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.