Featured application

Gawk Screens on Jersey Barriers

Concrete Jersey barriers may already contain lifting anchors that can do more than help place the barrier. NON-DRILL can use suitable anchors to support mesh panels or a rail-and-mesh gawk-screen arrangement, avoiding new holes in the concrete. The screen can be configured for the barrier and site layout, with the complete arrangement reviewed for wind loading. Adding shade cloth changes that loading and needs to be considered in the design.

Discuss your project

The starting point

Use the connection already available, or consider it early.

NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.

01

Existing connection

Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.

02

Design-stage connection

If the project is early enough, consider the position and purpose of the connection before manufacture or construction.

Application journey

From project information to an agreed pathway.

Each application follows the same route: identify what the structure already offers, match it to a connection, and agree the installation arrangement.

01

Review the structure

Confirm the element, project stage and when Edge Protection is required.

02

Identify the connection

Review existing anchor information or the opportunity to plan a connection into the build.

03

Confirm the arrangement

Provide the relevant product, installation and technical information for project review.

What to establish

Questions for the first project conversation.

01What anchors are present?

02What is being supported above the barrier?

03Are wind-loading or screening requirements involved?

Common questions

What project teams need to know first.

Can NON-DRILL be considered for Gawk Screens on Jersey Barriers?

Concrete Jersey barriers may already contain lifting anchors that can do more than help place the barrier. NON-DRILL can use suitable anchors to support mesh panels or a rail-and-mesh gawk-screen arrangement, avoiding new holes in the concrete. The screen can be configured for the barrier and site layout, with the complete arrangement reviewed for wind loading. Adding shade cloth changes that loading and needs to be considered in the design. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.

Does the anchor need to be planned into the design?

Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.

What should I send for an initial review?

Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.

Discuss your project

Discuss a Gawk Screens on Jersey Barriers application.

Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.

Discuss your project