Application

Container Edge Protection

When crews need access to the top of a site container, the exposed edge needs a practical protection method. NON-DRILL has a container connection designed for the existing locking slots on 20-foot and 40-foot containers, so handrail posts can be installed without drilling or permanently altering the container. Stairs and landings can be coordinated with the protected work area, giving the team a more complete access arrangement.

Discuss your project

The starting point

Use the connection already available, or consider it early.

NON-DRILL begins with the structure, the anchor or fixing point and the Edge Protection requirement. The product is then matched to the application rather than forcing the project into a generic arrangement.

01

Existing connection

Identify what is already cast into or available on the structure and review the relevant NON-DRILL product.

02

Design-stage connection

If the project is early enough, consider the position and purpose of the connection before manufacture or construction.

What to establish

Questions for the first project conversation.

01What container configuration is involved?

02Where is access required?

03What Edge Protection arrangement is proposed?

Common questions

What project teams need to know first.

Can NON-DRILL be considered for Container Edge Protection?

When crews need access to the top of a site container, the exposed edge needs a practical protection method. NON-DRILL has a container connection designed for the existing locking slots on 20-foot and 40-foot containers, so handrail posts can be installed without drilling or permanently altering the container. Stairs and landings can be coordinated with the protected work area, giving the team a more complete access arrangement. The available anchor, structure and complete Edge Protection arrangement must be reviewed for the project.

Does the anchor need to be planned into the design?

Not necessarily. Existing anchors are the most common starting point. Where the project is still at design stage, connection points can also be considered early.

What should I send for an initial review?

Send drawings, anchor details, dimensions, clear photographs, the project stage and a description of the Edge Protection requirement.

Discuss your project

Discuss a Container Edge Protection application.

Send the drawings, anchor details, photographs and project stage. NON-DRILL can help identify the likely next step.

Discuss your project